A running diary and job jar of work items and notes on ODMref 1.0 Project Tracking

Status

Date

Description

     
     
     
     
done 2005-05-13 List the pages of this folio on the cover page
done 2005-05-13 Remove centering of bottom description table cell here.
  2005-04-10 Thread a progress report history through a second "view" page under the status section. [dh:2005-05-13 I listed these on the cover of this folio for now].
done 2005-04-10 Hook up the progress report as the latest tracking report.
  2005-04-10 In a later version of P050405c, also include a refresh of the Engagement and Assessment dats from the Exception Review.
  2005-04-10 Revise the Progress Report P050405c to show versioning on itself and then include a revised external engagement allowance.
  2005-04-10 Connect the 2005-04-10 Progress Report to the Exception Review, the specification, and probably the previous progress report.
done 2005-04-09 Tie into the ODMref Plan Update folio and publish what we now have.
done 2005-04-09 Reflect reaching operational state, with version 0.10, in the Project Log.
done 2005-04-09 Link P050405c in as the current Tracking Report.
  2005-04-09 Review the objectives and conditions of satisfaction, and add discussion of how these are satisfied in version 0.20 here.
  2005-04-09 It would really help to have a Work Breakdown Structure that applied from the beginning of Plan Version 6.0 too.
  2005-04-09 Connect the material to the TROST items that are mentioned in P050402, P050402b, and P050402c.
done 2005-04-09 Add cross linking among the tracking pages and also tie them to the work breakdown structure that matches the organization of the tasks they present.
done 2005-04-09 Make sure the timestamps in the tracking-report pages update for all automatic updates to pages, so the status / tracking.htm page has its timestamp updated too.
done
2005-04-09
2005-04-06 Correct the Project Folio ID in the <head> of this page and the page this page was customized from.  Check P050402b also.
done
2005-04-09
2005-04-05 The tasks need to be identified in a work-item list so that tracking is against something meaningful.  [dh:2005-04-06 These need to be a folio of updated items as well, since there is a configuration around different versions of the single plan that I manage from.] [dh:2005-04-09 The Work Breakdown Structure works for this, and the tracking pages now identify the work breakdown they are related to.]
done 2005-04-05 Create a 2005-04-04 Status page as the basis for today's status. [dh:2005-04-04 This is basically a placeholder.  I haven't got the patter down yet, and am not sure how heavily to use the pictures.]
  2005-04-05 Review for items to be accounted for and additional project folios to create.
done
2005-04-09
2005-04-05 Create a status/tracking page that uses a FrontPage Include Page to mirror the latest tracking report.
done 2005-04-05 Create the snapshot through 04-04 and have the screen shots available as full-size captures.  These will be used in the plan update description.
done 2005-04-05

Create this page with the Lab Notebook style


Construction Zone (Hard Hat Area) You are navigating the
ODMA Interoperability Exchange.

created 2005-04-05-12:16 -0700 (pdt) by orcmid
$$Author: Orcmid $
$$Date: 10-08-29 20:11 $
$$Revision: 26 $